{"id":7834,"date":"2026-04-10T16:12:00","date_gmt":"2026-04-10T16:12:00","guid":{"rendered":"https:\/\/sedahuanuco.com\/web\/?p=7834"},"modified":"2026-04-10T16:14:40","modified_gmt":"2026-04-10T16:14:40","slug":"seda-huanuco-y-el-gobierno-regional-tienen-listo-el-diseno-preliminar-de-la-nueva-linea-de-conduccion-y-optimizacion-del-servicio-de-agua-potable","status":"publish","type":"post","link":"https:\/\/sedahuanuco.com\/web\/blog\/2026\/04\/10\/seda-huanuco-y-el-gobierno-regional-tienen-listo-el-diseno-preliminar-de-la-nueva-linea-de-conduccion-y-optimizacion-del-servicio-de-agua-potable\/","title":{"rendered":"SEDA HUANUCO Y EL GOBIERNO REGIONAL TIENEN LISTO EL DISE\u00d1O PRELIMINAR DE LA NUEVA LINEA DE CONDUCCI\u00d3N Y OPTIMIZACI\u00d3N DEL SERVICIO DE AGUA POTABLE."},"content":{"rendered":"\n<p><strong><em>Despu\u00e9s de 68 a\u00f1os se proyecta construir una nueva l\u00ednea de conducci\u00f3n para garantizar el abastecimiento y la continuidad del servicio a m\u00e1s de 250 mil huanuque\u00f1os.<\/em><\/strong><\/p>\n\n\n\n<p>La EPS SEDA HU\u00c1NUCO S.A. Y el Gobierno Regional, firmaron un convenio hist\u00f3rico para Hu\u00e1nuco, se trata de la nueva l\u00ednea de conducci\u00f3n de agua, a fin de garantizar en la prestaci\u00f3n del servicio a m\u00e1s de 250 mil pobladores de Hu\u00e1nuco, Amarilis y Pillco Marca.<\/p>\n\n\n\n<p>Cabe resaltar que despu\u00e9s de 68 a\u00f1os se proyecta construir una nueva l\u00ednea de conducci\u00f3n de agua de 7 kil\u00f3metros aproximadamente, y la tercera planta de tratamiento de agua, con una inversi\u00f3n inicial de 103 millones de soles, financiado por el Gobierno Regional, a trav\u00e9s de obras por impuestos.<\/p>\n\n\n\n<p>La propuesta fue elaborada por el equipo t\u00e9cnico, integrado por los profesionales de Seda Hu\u00e1nuco, Otass, la Municipalidad provincial y el Gobierno Regional de Hu\u00e1nuco. &nbsp;La necesidad es muy urgente, el canal de conducci\u00f3n actual presenta un riesgo inminente de colapso, debido a la antig\u00fcedad. Actualmente se encuentra en la etapa de elaboraci\u00f3n de bases y aprobaci\u00f3n a fin de llevarse a cabo la licitaci\u00f3n p\u00fablica para la ejecuci\u00f3n de este anhelado proyecto.<\/p>\n\n\n\n<p><strong>Componentes b\u00e1sicos del proyecto:<\/strong><\/p>\n\n\n\n<p>Sistema de Captaci\u00f3n de agua del r\u00edo Higueras, con capacidad de 900 litros por segundo, que incluye la construcci\u00f3n del desarenador. &nbsp;<\/p>\n\n\n\n<p>Sistema de conducci\u00f3n de 7 kil\u00f3metros, con tuber\u00edas de Polietileno de alta densidad (HDP) que son materiales termopl\u00e1sticos flexibles y resistentes para transporte de agua, con capacidad de 900 litros por segundo.<\/p>\n\n\n\n<p>Instalaci\u00f3n de v\u00e1lvulas de aire y purga de sedimentos.<\/p>\n\n\n\n<p>Construcci\u00f3n de la tercera planta de tratamiento de agua en Cabrito pampa, capacidad de producci\u00f3n 330 litros por segundo y un reservorio de 2500 M3 de almacenamiento.<\/p>\n\n\n\n<p>La EPS SEDA Hu\u00e1nuco S.A. administrado por el OTASS reafirma su compromiso con la mejora continua de sus servicios, trabajando de manera articulado con los sectores estrat\u00e9gicos en agua y saneamiento.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"905\" height=\"536\" data-id=\"7836\" src=\"https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/2-nueva-planta.jpg\" alt=\"\" class=\"wp-image-7836\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"902\" height=\"514\" data-id=\"7838\" src=\"https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta-1.jpg\" alt=\"\" class=\"wp-image-7838\" srcset=\"https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta-1.jpg 902w, https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta-1-300x171.jpg 300w, https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta-1-768x438.jpg 768w, https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta-1-280x160.jpg 280w\" sizes=\"auto, (max-width: 902px) 100vw, 902px\" \/><\/figure>\n<\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Despu\u00e9s de 68 a\u00f1os se proyecta construir una nueva l\u00ednea de conducci\u00f3n para garantizar el abastecimiento y la continuidad del servicio a m\u00e1s de 250 mil huanuque\u00f1os. La EPS SEDA HU\u00c1NUCO S.A. Y el Gobierno Regional, firmaron un convenio hist\u00f3rico para Hu\u00e1nuco, se trata de la nueva l\u00ednea de conducci\u00f3n de agua, a fin de<\/p>\n","protected":false},"author":8,"featured_media":7837,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[507],"tags":[],"table_tags":[],"class_list":["post-7834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-notas-de-prensa-y-noticias"],"blog_post_layout_featured_media_urls":{"thumbnail":["https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta-150x150.jpg",150,150,true],"full":["https:\/\/sedahuanuco.com\/web\/wp-content\/uploads\/2026\/04\/1-nueva-planta.jpg",902,514,false]},"categories_names":{"507":{"name":"NOTAS DE PRENSA Y NOTICIAS","link":"https:\/\/sedahuanuco.com\/web\/blog\/category\/notas-de-prensa-y-noticias\/"}},"tags_names":[],"comments_number":"0","_links":{"self":[{"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/posts\/7834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/comments?post=7834"}],"version-history":[{"count":1,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/posts\/7834\/revisions"}],"predecessor-version":[{"id":7839,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/posts\/7834\/revisions\/7839"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/media\/7837"}],"wp:attachment":[{"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/media?parent=7834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/categories?post=7834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/tags?post=7834"},{"taxonomy":"table_tags","embeddable":true,"href":"https:\/\/sedahuanuco.com\/web\/wp-json\/wp\/v2\/table_tags?post=7834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}